01Mine EPC+M+O

One delivery system. Five connected disciplines.

Keep responsibility connected from the first sample through commissioning and operating stabilization.

Discuss your project
Industrial mineral processing pilot test equipment
01E

Research & engineering

Test the ore, define the process route, and turn geological and metallurgical evidence into an executable mine plan.

02P

Procurement

Configure, manufacture, source, inspect, and deliver the equipment package against the approved process design.

03C

Construction

Coordinate civil works, installation, commissioning, and the handover from drawings to a functioning plant.

04M

Management

Build the operating system, staffing plan, maintenance discipline, and production controls around the new asset.

05O

Operation

Support or undertake mine and plant operations to stabilize production, recovery, cost, safety, and environmental performance.

02Research & design

Make the processing route earn its place.

The laboratory and engineering team connect sample evidence to the design basis, limiting rework between feasibility and execution.

01

Mineralogy & testwork

Ore properties, grindability, separation response, and recovery routes are tested before the flowsheet is fixed.

02

Process & mine design

Process, equipment, civil, electrical, water, tailings, and mine systems are coordinated into one design basis.

03

Pilot verification

Industrial-scale pilot capability helps validate critical process assumptions before full implementation.

03Construction & operation

Design for the plant that must actually run.

Installation, commissioning, operating preparation, maintenance, and production management feed practical constraints back into the engineering and equipment decisions.

Scope an EPC+M+O project
Completed Xinhai mineral processing plant